System II for Garage Refurbishment
System Garage refurbishment
PCI system solutions for refurbishing and improving the appearance of old garages without the use of reaction resins

Description
PCI system solutions for floor refurbishment of garages
Garages are continually subject to extreme stress. Not only mechanical loads, with high point loads caused by vehicles entering and leaving, but also heat, frost, water, moisture, deicing salt and oil deposits attack the structure of the floor surface over the course of time. As a result of the wide variety of stresses, the screed or the exposed concrete floor releases sand; chips and holes appear in the concrete. Refurbishment then becomes essential. This damage can be fully repaired and avoided in the long term. A system without resin-based products has the advantage of being simple, quick, can be processed by anyone and provides optimal basic protection.
Garages are continually subject to extreme stress. Not only mechanical loads, with high point loads caused by vehicles entering and leaving, but also heat, frost, water, moisture, deicing salt and oil deposits attack the structure of the floor surface over the course of time. As a result of the wide variety of stresses, the screed or the exposed concrete floor releases sand; chips and holes appear in the concrete. Refurbishment then becomes essential. This damage can be fully repaired and avoided in the long term. A system without resin-based products has the advantage of being simple, quick, can be processed by anyone and provides optimal basic protection.
System advantages
- Value maintenance
- Prevention of damage
- Durable refurbishment
You need

1
Floor/wall leveler
PCI Nanocret® R4 PCC
Heavy-duty repair mortar for concrete structures on floors, walls and overhead application
2
3
4
5
More product systems
YOUR DIRECT CONTACT
Downloads
System data sheet